

Temperature and Humidity Stability Chamber
温湿度稳定性试验箱
- SKU STC-0005
- Stability Chambers
- CE (to be confirmed)
- IEC 61010-1 compliance (to be confirmed)
- ISO 13485 manufacturing (to be confirmed)
Price on request — FOB / CIF quoted per order
Prices depend on configuration, quantity and destination port.
Key specifications
| Temperature range | 10–60 °C |
|---|---|
| Temperature stability | ±0.3 °C |
| Humidity range | 40–95 percent RH |
| Humidity stability | ±2 percent RH |
| Humidification | Steam or atomising |
| Chamber volume | about 100–1000 L |
By Lab Manufacturers China Technical TeamLast reviewed Standards: ICH Q1A(R2), ICH Q1B, ICH Q1C
What is the Temperature and Humidity Stability Chamber?
A temperature and humidity stability chamber controls both parameters precisely for ICH storage, with tight uniformity and recovery. It is chosen when studies require strict control of relative humidity as well as temperature.
What is the Temperature and Humidity Stability Chamber?
A temperature and humidity stability chamber controls both parameters precisely for ICH storage, with tight uniformity and recovery. It is chosen when studies require strict control of relative humidity as well as temperature.
Overview
This chamber focuses on precise simultaneous control of temperature and relative humidity. Humidification may use steam injection, which is clean and responds quickly, or an atomising or ultrasonic system, while dehumidification is achieved by cooling the air below its dew point and reheating it. A cascade or single-stage refrigeration system holds low temperatures, and a microprocessor controller manages the interaction between cooling, heating and humidification so that both parameters stay within specification. Dense sensor arrays and mapping demonstrate uniformity, and alarm systems flag excursions. Because humidity control consumes water and generates condensate, water quality and drainage matter. Uniformity and recovery after door opening are the decisive performance measures for long stability studies.
How does it work?
A stability chamber controls the environment around stored samples. Compressor or Peltier cooling removes heat, resistive or steam humidification adds moisture, and heaters raise temperature when needed, all regulated by sensors and controllers. Forced-air circulation distributes conditioned air through the chamber so temperature and humidity are uniform around every shelf position. ICH guidance defines the conditions: 25 °C and 60 percent relative humidity, or 30 °C and 65 percent relative humidity, for long-term studies, and 40 °C and 75 percent relative humidity for accelerated studies, with photostability testing under defined illumination. Continuous monitoring with alarms and chart or electronic records proves that conditions stayed within limits, and some chambers can run different zones at different conditions simultaneously.
What are the key features?
- Simultaneous temperature and humidity control
- Steam or atomising humidification
- Dew-point dehumidification with reheat
- Microprocessor control of interacting parameters
- Dense sensor mapping and alarms
- Condensate drainage and water quality control
What are the technical specifications?
A typical temperature and humidity stability chamber configuration offers temperature range of 10–60 °C, temperature stability of ±0.3 °C, humidity range of 40–95 percent RH, humidity stability of ±2 percent RH, humidification of Steam or atomising and chamber volume of about 100–1000 L. Values are indicative of the product class; the exact figures for each configuration are confirmed on the quotation and the calibration documents supplied with the instrument.
Which applications is it used for?
The Temperature and Humidity Stability Chamber is used in ICH long-term and accelerated studies, humidity-sensitive product testing, climatic zone storage requirements and packaging moisture studies. Across the wider Stability Chambers class, laboratories also deploy it for ICH long-term stability studies, accelerated stability testing and photostability testing.
Which standards and certifications apply?
Relevant standards and methods include ICH Q1A(R2), ICH Q1B, ICH Q1C, IEC 61010-1, IEC 61010-2-010 and ISO 17025. Certification candidates for this model are CE, IEC 61010-1 compliance and ISO 13485 manufacturing; each is to be confirmed for the specific configuration before shipment, and certificates are supplied only where they have been issued.
Install the chamber where ambient conditions are stable and within the manufacturer's limits, with clearance for airflow around the condensing unit. Connect a water supply or drain if humidification requires it, and prepare an emergency power plan so a failure does not destroy a long study. Map temperature and humidity at empty, partial and full load before use and after any major service, and repeat the mapping periodically. Set alarms for deviation, power loss and door-open events, and keep continuous records. Maintain the humidifier, filters and refrigeration system on schedule, and retain all monitoring data for the study period plus the required retention time.
How do I select the right Temperature and Humidity Stability Chamber?
Select this chamber when humidity limits are tight or when humidity-sensitive products or packaging are studied. Confirm achievable range and stability for both parameters, uniformity, recovery time after door opening and water and drainage requirements. Verify controller independence so humidity changes do not drag temperature out of specification.
How does it compare with other Stability Chambers variants?
Select a stability chamber from the ICH conditions you must support, the number of sample positions and the study duration. Benchtop units suit development and small batches; reach-in cabinets handle routine stability programmes; walk-in rooms are used when very large sample sets or many studies run in parallel. Photostability chambers add controlled illumination to the option list. Compare temperature and humidity range and stability, uniformity across shelves, recovery after door opening, alarm and monitoring systems, and whether the chamber supports multiple independent zones. Check the power, water and drainage requirements, and confirm that qualification documentation and mapping reports are provided, because regulators expect them.
Full specifications
| Temperature range | 10–60 °C |
|---|---|
| Temperature stability | ±0.3 °C |
| Humidity range | 40–95 percent RH |
| Humidity stability | ±2 percent RH |
| Humidification | Steam or atomising |
| Chamber volume | about 100–1000 L |
| Recovery after door opening | about 5–15 min |
| Power supply | 220 V, 50 Hz, about 1–4 kW |
Indicative values for this product class. Final specifications are confirmed on the quotation and in the calibration documents supplied with the instrument.
Applications
- ICH long-term and accelerated studies
- Humidity-sensitive product testing
- Climatic zone storage requirements
- Packaging moisture studies
Key features
- Simultaneous temperature and humidity control
- Steam or atomising humidification
- Dew-point dehumidification with reheat
- Microprocessor control of interacting parameters
- Dense sensor mapping and alarms
- Condensate drainage and water quality control
Frequently asked questions about Temperature and Humidity Stability Chamber
Humidity is added by steam injection or by an atomising or ultrasonic humidifier and removed by cooling the air below its dew point so water condenses out, then reheating to the set temperature. This gives control across a wide relative humidity range.
Demineralised or purified water is recommended for humidification, because minerals deposit on the humidifier and inside the chamber and can contaminate samples. Water quality should be specified in the operating procedure and checked periodically.
Recovery within about 5 to 15 minutes is typical for a well-controlled cabinet, depending on load and time the door is open. Recovery should be verified experimentally and documented, since slow recovery extends the deviation period during loading.
General case long-term conditions are 25 °C and 60 percent relative humidity, or 30 °C and 65 percent relative humidity, for at least 12 months. Accelerated storage is 40 °C and 75 percent relative humidity for six months, with intermediate conditions where needed.
Temperature and humidity mapping is normally done after installation, then periodically, for example annually, and again after any major repair or relocation. Mapping is performed empty, at partial load and at full load so that the usable working volume and uniformity are demonstrated.
Conditions deviate and the event must be recorded and assessed for impact on the study. A backup generator or power supply, alarm notification and documented recovery procedure limit losses, and samples exposed to out-of-specification conditions may need to be re-tested or replaced.
Related models






